Lowongan Kerja PT Pertamina EP Cepu

Share

Advertisement
PT Pertamina EP Cepu

Lowongan Pertamina EP Cepu

About PT Pertamina EP Cepu (PEPC)

PT Pertamina EP Cepu – PEPC is a leading oil and gas upstream company in Indonesia which is rapidly growing. as a subsidiary of PT Pertamina (Persero), PT. Pertamina EP Cepu (PEPC) has performance targets set by the parent company. It is recognized that the performance targets are not easy to achieve, but the whole range of staff PEPC confident that with the encouragement and support of all parties, the target is not impossible to achieve.

PT Pertamina EP Cepu
www.pertamina-epcepu.com

PT. Pertamina EP Cepu (PEPC) currently has 2 (two) major tasks that must be implemented in order to achieve corporate targets are:

  • As Partner / Co-Venture Non Operator in managing Cepu block with 45% PI.
  • As executor Distribution Monitoring Petroleum Production Banyu Urip EPF which was bought by Pertamina and flowed downstream from Banyu Urip to FSO Love Natomas JOB-PPEJ.

There are 3 (three) main activities in Cepu, which began in 2006, the activities of exploration, development Banyu Urip Oil Field and Gas Field Development Planning activities Jambaran-Sandalwood. All three types of activities are carried out either in the form of studies, technical design, maintenance and licensing activities and operations budget (execution) in the field.

Exploration Block Cepu since early 2007 relative to run according to the program, but for exploration drilling activities occurred several schedule delays due to procurement issues drilling rig. Starting in 2010 drilling exploration (wildcat and delineation) will be conducted on an ongoing basis using a special rig contracted for 2 (two) drilling location and opened additional options to a total of 7 (seven) drilling locations.

Oil Field Development Activities Banyu Urip much delayed, performed with 2 (two) way is to Project Early Production Facilities (EPF) held since 2007, has produced oil from 31 August 2009. At this time Banyu Urip EPF production reached an average of 18,800 BOPD.

Activity Full Field Development Oil Field Banyu Urip through EPC1-5 project, until mid-2010 was at the stage of approval by the Procurement Plan BPMigas. Pre-qualification tender process has been started since the first quarter of 2010, in parallel with the AFE approval by each of these EPC BPMigas, with a target of Contract Award to be completed in the first quarter and second quarter of 2011.

Companies prepare scenarios based Development Block Cepu with current legal conditions are still referring to the Joint Operating Agreement (JOA), which is where the PEPC as a partner MCL.

History

BASED Law. 22 Year 2001 on Oil and Gas and PP. 31 Year 2003 on “Transfer Form Pertamina into a Limited Liability Company (Limited)”, Pertamina no longer holds Mining and change into PT Pertamina (Persero). As a rule implementing Law. 22 of 2001, the Government issued Government Regulation. 35 Year 2004 on Upstream Oil and Gas which in Article 104 stated that Contract – Contract Pertamina Technical Assistant Contract (TAC) and Enhanced Oil Recovery (EOR) switch to PT Pertamina (Persero) and the former contract is still a part of the territory of PT Pertamina (Persero). Thus Cepu TAC should be the working area of ??PT Pertamina (Persero).

Not long after the Government issued Government Regulation. 34 of 2005 on Amendment of PP. 35 Year 2004 on Upstream Oil and Gas, which by reason of the production of oil and gas to speed up the Cepu Contract TAC can be converted into a Cooperation Contract (PSC) and are not automatically restored as the Work Area Mining (WKP) Pertamina.

On 17 September 2005, the starting point for the operation of Pertamina EP Cepu organization with the signing of the Cooperation Contract (PSC) between BP Migas Cepu block on behalf of the Government and the Contractor that Mobil Cepu Limited (MCL) and Ampolex (both subsidiaries of Exxon Mobil) and Pertamina EP Cepu (Subsidiary of PT Pertamina (Persero)) with a contract period of 30 years. Composition PI respectively – each party in MCL and the Contractor is Ampolex (50%) and Pertamina EP Cepu (50%).

On October 30, 2008 and February 26, 2009 signed the supplementary aggrement JOA which includes the Regional Owned Enterprises (enterprises) as one of the Participating Interest (PI) of 10% so that Pertamina EP Cepu PI to 45%, MCL and Ampolex to 45%.

Migas Cepu block is WKP which includes 3 (three) the district is Bojonegoro and Tuban – East Java Province and Blora Regency – Central Java Province. To manage oil and gas activities in the Cepu PSC then the long process finally on March 15, 2006 signed between the MCL JOA Cepu, Pertamina EP Cepu Ampolex and which became effective backward from the date of 17 September 2005. In the JOA was also stated that the MCL was appointed as Operator Cepu.

There are 3 (three) main activities Upstream Oil and Gas sector in Cepu, which began in 2006, the Exploration, Development Banyu Urip Oil Field and Gas Field Development Planning activities Jambaran-Sandalwood. All three types of activities are carried out either in the form of studies, technical design, maintenance and licensing activities and operations budget (execution) in the field.

Exploration Block Cepu since early 2007 relative to run according to the program, but for exploration drilling activities occurred several schedule delays due to procurement issues drilling rig. Starting in 2010 drilling exploration (wildcat and delineation) will be conducted on an ongoing basis using a special rig contracted for 2 (two) drilling location and opened additional options to a total of 7 (seven) drilling locations.

Oil Field Development Activities Banyu Urip much delayed, performed with 2 (two) way is to Project Early Production Facilities (EPF) held since 2007.

On August 31, 2009 First Commercial Production BPMIGAS establish oil production from the Field Banyu Urip with an average production of 2160 BOPD (45% share).

On August 17, 2011 signed by Head Of Agreement (HOA) between MCL, Pertamina EP Cepu, and PT Pertamina EP (PEP) contains Field unitization Jambaran (owned Cepu PSC) with golf Tiung Blue (owned PEP), Pertamina EP Cepu as Field unitization operator Jambaran-Tiung Blue and integrated development field unitization Ground Sandalwood. This is a new chapter for Pertamina EP Cepu especially to be able to make a significant contribution in the development of the Blue Square Jambaran Tiung from only a non-operator in Cepu later became Operator Field unitization Jambaran Tiung Blue and increasing value for PT Pertamina (Persero) generally . Pertamina EP Cepu as the operator in Cepu Gas Development will implement development projects with accelerated schedules targeted on stream gross production of 315 MMSCFD (Raw Gas) in 2016.

In accordance with the mission of the company to meet the targets assigned by the State to PT Pertamina (Persero) to increase national oil and gas production and find new oil and gas reserves, particularly in Cepu, the long-term plan will describe the strategic direction and impact of the planned work program Pertamina EP Cepu for the next five years, either functions or duties as a partner of Pertamina EP Cepu Block Development Operator and the Operator Cepu field unitization Jambaran Tiung Blue or as an institution subsidiary has authority to Distribution Monitoring Petroleum PT Pertamina (Persero) Banyu Urip – FSO Love Natomas.

In order for targets that can be achieved effectively, the Pertamina EP Cepu will make corrections and improvements both internally and externally. Internal Pertamina EP Cepu will undertake corrective measures in a systematic, directed and continuous ranging from business processes to increase the ability of HR to a more professional and world class. Increased human resource capacity will be useful for business continuity Pertamina EP Cepu fore in particular and useful for PT Pertamina (Persero) to develop similar projects, the larger and more challenging others in general.

External repairs, Pertamina EP Cepu will make efforts persuasive approach to the partners and other parties concerned to encourage operators to achieve the target completion Filed Full Development ie mid-2014, in addition to existing efforts to increase production from the Early Production Facilities (EPF) from 20,000 BOPD to over 27,000 BOPD.

Company Contact

CONTACT PERTAMINA EP CEPU – HEAD OFFICE
Patra Jasa Tower, Level 6th – 8th
Jl. Gatot Subroto, Kav. 32-34 Jakarta 12950
Telp. + 62 21 52900900 – Fax. +62 21 52900597

Jobs Available

PT Pertamina EP Cepu now is seeking the candidates who are interested to learn and gaining hands-on experience in oil and gas business as follow :

  1. Rotating & Package Construction Engineer
  2. Instrument & Control Construction Engineer
  3. Project Planning Senior Engineer
  4. Piping Construction Superintendent
  5. Civil & Structure Construction Superintendent
  6. Mechanical Construction Superintendent
  7. Assistant Manager Transportation

Jobs Description

Rotating & Package Construction Engineer

Requirements

  • Minimum Bachelor or Master Degree (S1/S2), majoring in Mechanical Engineering, Petroleum/Oil and Gas Engineering, Mechatronics/Electromechanical Engineering, or other equivalent Engineering majors.
  • Minimum 10 years of experience in project management, engineering and project execution including minimum 3 years in Oil and Gas industry and 5 years of experience in rotating and package construction function. Preferably as Supervisor/Staff specializing in Engineering – Mechanical/Automotive, Construction Mechanical Rotating Package.
  • Fluent spoken and written English and Bahasa Indonesia.
  • Expertise with Rotating Package, Mechanical Design.
  • Contract position(s) available.

Instrument & Control Construction Engineer

Requirements

  • Minimum Bachelor or Master Degree (S1/S2), majoring in Electrical/Electronic Mechanical Engineering, Petroleum/Oil and Gas Engineering, or other equivalent Engineering majors.
  • Minimum 10 years of experience in project management, engineering, construction and project execution including minimum 3 years in Oil and Gas industry and 5 years of experience in instrument and control construction function. Preferably as Supervisor/Staff specializing in instrument and control.
  • Fluent spoken and written English and Bahasa Indonesia.
  • Expertise with instrument and control, project management, instrument calibration.
  • Contract position(s) available.

Project Planning Senior Engineer

Requirements

  • Minimum Bachelor or Master Degree (S1/S2), majoring in Petroleum/Oil and Gas Engineering or other equivalent.
  • Minimum 10 years of experience in project management, engineering, construction and project execution including minimum 3 years in Oil and Gas industry and 5 years of experience in project construction planning. Preferably as Supervisor/Staff specializing in Engineering – Oil/Gas or equivalent.
  • Expertise with project management and risk management.
  • Contract position(s) available.

Piping Construction Superintendent

Requirements

  • Minimum Bachelor or Master Degree (S1/S2), majoring in Civil Engineering, Mechanical Engineering, Petroleum/Oil and Gas Engineering, Metal Fabrication/Tool and Die/Welding Engineering, or other equivalent Engineering majors.
  • Minimum 15 years of experience in oil and gas company and the related field. Preferably as Assistant Managers specializing in Engineering – Civil/Construction/Structural, Piping Construction or equivalent.
  • Expertise with Microsoft Project, Microsoft Office, Piping Construction, Piping System Design, and Project Construction.
  • Contract position(s) available.

Civil & Structure Construction Superintendent

Requirements

  • Minimum Bachelor or Master Degree (S1/S2), majoring in Civil Engineering, Petroleum/Oil and Gas Engineering or other equivalent.
  • Minimum 12 years of experience in the related field. Preferably as Assistant Managers/Superintendent specializing in Engineering – Civil/Construction/Structural or equivalent.
  • Expertise with Civil and structural design, project management, oil and gas facilities project, risk management, health and safety management.
  • Fluent spoken and written English and Bahasa Indonesia.
  • Contract position(s) available.

Mechanical Construction Superintendent

Requirements

  • Minimum Bachelor or Master Degree (S1/S2), majoring in Mechanical Engineering, Petroleum/Oil and Gas Engineering, Mechatronics/Electromechanical Engineering, or other equivalent Engineering majors.
  • Minimum 15 years of experience in project management, project construction, engineering and project execution including minimum 10 years in Oil and Gas industry and 5 years of experience in mechanical construction funtional. Preferably as Assistant Managers/Superintendent specializing in Engineering – Mechanical Construction or equivalent.
  • Expertise with Microsoft Project, Mechanical Design, Oil and Gas Contruction Project.
  • Have a good leadership skill.
  • Have a project management skill.
  • Contract position(s) available.

Assistant Manager Transportation

Requirements

  • Minimum Bachelor or Master Degree (S1/S2), majoring in Economics, Industrial Enhineering, Hospitality, Tourism, Hotel Management, Logistic, Transportation, Business Studies, Administration, Management or equivalent.
  • Minimum 6 years of experience in the related field, preferably as Assistant Manager.
  • Have a good leadership and negotiation skills.
  • Have a good transportation management skill.
  • Fluent spoken and written English and Bahasa Indonesia.
  • Contract position(s) available.

Sites Reference

  1. www.pertamina-epcepu.com

Submit Application

If you are interested and competent in accordance with the requirements, please submit your application directly through Jobstreet’s system at :

Notes

  • Only qualified candidates that meet with the above requirements would be processed in this recruitment.

Lowongan Kerja Pertamina EP Cepu by lokercpnsbumn.com