Advertisement
Lowongan Kerja KAI UNTAR
About PT Kereta Api Indonesia (Persero) – PJKA
PT Kereta Api Indonesia (Persero) – PJKA is a state owned enterprise in charge of the Indonesian railway transport services. Rail service Indonesia PT (Persero) covering passenger and freight transport. At the end of March 2007, confirms the revision of Law No. DPR. 13/1992 which stressed that local governments and private investors are given the opportunity to organizing railway transport services in Indonesia. On 14 August 2008 Railway PT Indonesia (Persero) to do the separation of the PT division Jabotabek Jabotabek Commuter Rail (KCJ) to manage the train commuters in the greater Jakarta area. for the year 2008 the number of passengers exceeds 197 million.
The presence of a train in Indonesia marked the first hoeing in a village road development Kemijen KA, Friday the 17th of June 1864 by Governor General of Dutch East Indies, Mr.. Baron van den L.A.J Sloet Beele. Development initiated by the “Naamlooze Venootschap Spoorweg Nederlandsch Indische Maatschappij” (NV. NISM) led by Ir. JP de Bordes from Kemijen towards the village of Liability (26 km) with a width of 1435 mm gauge. This road section is open for public transport on Saturday, 10 August 1867.
Private success, NV. NISM development of roads between Kemijen KA – Liability, which later on February 10, 1870 will connect the city of Semarang – Surakarta (110 km), ultimately led to the development of roads investor interest in other regions KA. Not surprisingly, if the growth of rail road length between 1864 – 1900 did the rapid growth. If the new 25 km in 1867, the year 1870 to be 110 km, in 1880 reached 405 km, 1427 km in 1890 and became in 1900 a 3338 Km.
In addition to Java, KA road development is also done in Aceh (1874), North Sumatra (1886), West Sumatra (1891), South Sumatra (1914), even in 1922 in Sulawasi has developed over the 47 km road between KA Makasar – Takalar, the operation has to be the 1st of July 1923, the rest Ujungpandang – Maros did not get resolved. While in Kalimantan, although have not developed, study the way KA Pontianak – Sambas (220 km) has been completed. Similarly, on the island of Bali and Lombok, has done studies KA road development.
Until the year 1939, a long way in Indonesia KA 6811 km. But, in 1950 reduced to 5910 km in length, less exceeding 901 km raib, which is expected since demolished during the Japanese occupation and transported to the Burmese for KA road development there.
KA rail road type in Indonesia again to distinguish broad-gauge 1067 mm 750 mm (in Aceh) and 600 mm in some cross-branch and the city tram. The dismantled railway during the Japanese occupation (1942 – 1943) over 473 km, whereas the KA road, built during the Japanese occupation is 83 km between BAYAH – Cikara and 220 km between the Floating Market – Pekanbaru. Ironically, the technology is, the way KA Floating – Pekanbaru programmed completion of the development for 15 months which employs 27,500 people, 25,000 of them are Romusha. Road that crosses the marshes, hills, and the furious river rapids, a lot of tomb sacrifices swallow scattered throughout the Floating-Pekanbaru.
Following the independence of Indonesia diproklamir-state on 17 August 1945, employees who joined the EC, “The Railway Moeda” (Amka) took over the railroad’s kekuasa from the Japanese. The historic event occurred on 28 September 1945. Attitude by reading a statement and a member Amka Ismangil others, asserting that the starting date of 28 September 1945 railroad power in the hands of the Indonesian nation. Japanese people are not allowed to intervene again perkeretaapi’s business in Indonesia. This spirit is what sets 28 September 1945 as the Day of Railway in Indonesia, and dibentuknya “Railway Djawatan Republic of Indonesia” (DKARI). Ref: www.free-api.co.id
Vision
Be the best railroad service providers that focus on customer service and meet the expectations of stakeholders
Mission
Maintenance of railroad business, and business efforts penunjangnya, through business practices and organizational models best to provide high value added for stakeholders and the sustainability of the environment based on four main pillars: safety, timeliness, service and comfort
Company Contact
Kantor Pusat PT. Kereta Api Indonesia (Persero)
Alamat Kantor : Jalan Perintis Kemerdekaan No. 1 Bandung 40117
Telepon Kantor : (022) 4230031, 4230039, 4230054
Teleks Kantor : 28263, 28358
Fax Kantor : (022) 4203342, Toka 10039
Kotak Pos : PO Box 1163 Bandung 40000
Website : www.kereta-api.co.id
Email : kontak_pelanggan@kereta-api.co.id
Jobs Available
PT Kereta Api Indonesia (Persero) are currently seeking for highly qualified candidates through :
Job Fair PT Kereta Api Indonesia (Persero) March 2013
Jobs Description
Requirements
- S1 with min GPA of 2.75, majoring in : Mechanical Engineering Construction, Mechanical Engineering, Civil Engineering, Architectural Engineering, Transportation Engineering, Environmental Engineering / Civil Environmental, Electrical Engineering, Electrical Engineer / Power, Industrial Engineering, Telecommunication Engineering, Geodesy, Accounting, Management, General Medicine, Law, Psychology, Psychologist, Communication Science, Journalism, Public Relations, Tourism, Logistics, Hospitality, Pharmacist, English Literature, Public Relation, Curriculum and Education, Visual Communication Design
- D3 with min GPA of 2.75 majoring in : Mechanical Engineering, Civil Engineering, Engineering Architect, Electro Engineering, Electronics Engineering, Electricity / Power, Telecommunication, Informatic, Graphic Design / Visual / Products, Accounting, Management, Statistical, Administration, Taxation, Logistics, STTD Railways, Nursing, Information and Library Studies, Indonesian Literature, Secretary of Commerce / Business Administration, Secretariat, Public Relation, Interior design
- Height / weight (with ideal of weight / balanced) :
- Female: 155 cm (for customer service at least 160 cm)
- Male: 160 cm (for customer service at least 170 cm)
- Health and not color blind
- Well-behaved
- Never engage or drugs and psychotropic substances
- Not tattooed,
- Not pierced for Male
- Willing to be placed in all over area of PT. KERETA API INDONESIA (Persero)
Specific requirements
- Accounting (S1) : Preferably having accountants register certified (PPAK)
- Accounting (D3) : Preferably having Brevet A and B license
- General Medicine : Having Registration Certificate (STR) from the Council of medicine Indonesia.
Application letter signed by enclosing:
- Legalized copy of latest academic certificate
- Legalized copy of academic transcripts
- Copy of Valid National Identity Card (KTP)
- 4 (four) sheets of recent color photograph size 4×6 cm (please write your name on the back side)
- Legalized copy of accreditation certificate from BAN PT
- Medical certificate and explaining the height, weight and not color blind
- Drug-Free Certificate from the competent authority (submitted at the time of selection interview / final stage selection)
- Valid SKCK
- Statement letter (stamped Rp. 6.000, -) that willing to be placed in all working area of PT Kereta Api Indonesia (Persero)
- Curiculum Vitae (form supplied)
- For Customer service:
- Copy of foreign language certificate
- Not married letter from District
Sites Reference
- www.kereta-api.co.id
Submit Application
Please submit your complete applications above through :
Acara Job Fair di Universitas Tarumanagara, tanggal 22 Maret 2013, pukul 15.00 s/d selesai di Gedung Fakultas Ekonomi Kampus 2 Jl. Tanjung Duren No. 1, Jakarta Barat
Notes
- All applications will be treated as strictly confidential.
- Only short-listed candidates will be contacted for further process.
- Source
Lowongan Kerja KAI Untar by lokerpcnsbumn