Lowongan Kerja PT Pertamina Geothermal Energy

Author : Yuni Nobita Category :Pertamina October 28, 2014

Advertisement

Share

Lowongan Kerja Pertamina GE

About PT. Pertamina Geothermal Energy (PGE)

PT. Pertamina Geothermal Energy (PGE) is a subsidiary of PT Pertamina ( Persero ) . Pertamina GE since 2006 has been mandated by the government to develop 15 Geothermal Business Working Areas in Indonesia . Companies that provide energy without pollution , 90 % owned by PT Pertamina ( Persero ) and 10 % dimiliiki by PT Pertamina Dana Ventura .

A new era for geothermal energy started with the inauguration Kamojang Geothermal Field on January 29, 1983 and followed by the operation of geothermal power plant ( PLTP ) Unit – 1 ( 30MW ) on February 7, 1983 , and five years later the two units in operation with a capacity of each of 55 MW . On the island of Sumatra for the first time to operate Monoblock 2 MW in Sibayak – Brastagih as the first Power Plant in August 2001 and the first 20 MW of geothermal power plants in operation in the area Lahendong .

Over time the Government through the Presidential Decree. 76/2000 revoked the previous decree and enforce Law. 27/2003 on geothermal , where PT Pertamina no longer have a monopoly in the geothermal energy business, but sam with other geothermal business actors in Indonesia .

In implementing the law , Pertamina has returned 16 Business Working Areas ( WKP ) Geothermal Government of WKP 31 granted to manage .

On December 23, 2001 Oil and Gas Law No. impose government . 22/2001 on the management of oil and gas industry in Indonesia . Law brings a tremendous change for the oil and gas sector , including Pertamina . After the enactment of the law , Pertamina has the same status as other oil and gas businesses . On 17 September 2003 Pertamina change into PT Pertamina ( Persero ) and through Government Regulation ( PP ) No. . 31/2003 mandated to divert geothermal businesses that had been managed by PT Pertamina ntuk transferred to the Subsidiary later than two years after the company was formed . For the PT Pertamina established PT Pertamina Geothermal Energy ( PGE ) as a subsidiary that will manage the business activities in the field of geothermal .

PT Pertamina has management rights to 15 Business Working Areas ( WKP ) geothermal potential of 8,480 MW with a total equivalent to 4,392 MMBOE . Of the WKP 15 , 10 WKP managed by PGE , namely ( 1 ) Kamojang : 200 MW , ( 2 ) Lahendong : 60 MW , ( 3 ) Sibayak : 12 MW , ( 4 ) Ulubelu , ( 5 ) Lumutbalai , ( 6 ) Hululais , ( 7 ) Kotamubagu , ( 8 ) and Full River ( 9 ) Iyang Argopuro and ( 10 ) Karahabodas . Three of them have been in production areas with a total capacity of 272 MW equivalent to 12,900 BOEPD . The rest were managed with partner production capacity of 922 MW .

Pertamina Geothermal in business has always focused on activities to increase production in the three regions of operation ( Kamojang , Lahendong and Sibayak ) . Total production of the 3 areas of existing operations of 9.5 million tons of steam with the generation of 1.3 million MWh . In addition to the contribution of KOB is 30.37 million tons and 4.1 million MWh of steam . Total annual geothermal steam production 39.89 million tons with power generation of 5.36 million MWh .

CONTACT PERTAMINA GEOTHERMAL ENERGY

Fix Phone : 500 000 (from all cities in Indonesia)
Phone : +62 21 7917 3000
Fax: +62 21 7972 177
SMS : +62 21 7111 3000
E-Mail : pcc@pertamina.com
Office : Menara Cakrawala lt 11, Jl. MH. Thamrin No.9, Jakarta 10340

Jobs Available

PT Pertamina Geothermal Energy are seeking for suitably qualified and professional candidates to join as :

Advertisements

  1. Asisten HSE Manager
  2. Safety Engineer

Jobs Description

Asisten HSE Manager

Job Requirement

  • Education: Minimum S1 Mechanical / Environmental / K3
  • Capabilities and Competencies:
    • Master and understand the Safe Work Practice and Environmental Management System and OHSAS
    • Familiar do Risk Assessment
    • Fluent in English (oral and written), TOEFL scores Min. 500
  • Experience: minimum 10 years work experience in the field of Healthy & Safety Geothermal Projects / Oil and Gas / Energy Other.
  • Location Placement:
    • Project Lumut Balai, Muara Enim, South Sumatra Province
    • Karaha project, Tasikmalaya District, West Java Province
  • Employment Status: Contract Employee (Worker Specific Time)

Safety Engineer

Job Requirement

  • Education: Minimum S1 Mechanical / Environmental / K3
  • Capabilities and Competencies:
    • Master and understand the Safe Work Practice and Environmental Management System and OHSAS
    • Familiar do Risk Assessment
    • Fluent in English (oral and written), TOEFL scores Min. 500
  • Experience: minimum 10 years work experience in the field of Healthy & Safety Geothermal Projects / Oil and Gas / Energy Other.
  • Location Placement:
    • Lahendong, Minahasa regency, North Sulawesi
    • Project Kamojang, Garut, West Java Province
  • Employment Status: Contract Employee (Worker Specific Time)

Sites Reference

  1. www.pertamina.com

Submit Application

Should you are interested and meet with minimumRequirements above, please register and submit your application through :

Advertisements

Notes

  • Application not later than 2 November 2014.
  • Only qualified candidate match with the above mentioned qualifications will be notified for further selection.

Lowongan Kerja Pertamina GE brougth to you by lokercpnsbumn

Tags : bumnloker bumn geothermalloker bumn gothermallowonga pertamina geothermallowongan bumn pertamina geothermallowongan PGEoil gasPGE, Terms : pertamina geothermal career, pge kamojang lowongan, loker di pertamina GE, lowongan PT pertaminan geothermal energy, pertamina geo
Pt BMC, pt garuda indonesia rekrutmen november 2014, PT gajah tunggal tbk, indolakto, loker 2014 mataram, lowongan pertamina medan, loker 2014 kbn cakung, lowongan pekerjaan bpjs kesehatan, Www wika com, lowongan indofood fritolay makmur semarang